Electrical Panel Upgrades in Toronto
More capacity for EV chargers, renovations and modern appliances, installed safely by licensed electricians with ESA notification handled.
Is your panel keeping up with your home?
Older electrical panels were not designed for today's homes. Adding an EV charger, a basement suite, central air, new kitchen appliances or a large lighting project can push an older panel past what it was built for.
Our licensed electricians assess your current panel and electrical load, recommend the right upgrade, and complete the work safely and cleanly, with the required ESA notification handled. We explain the timeline and any power shut-off in advance.

Signs you may need an upgrade
Frequent tripping
Breakers that trip when several appliances run at once.
Older or fuse panels
Outdated equipment that limits what you can add to your home.
Adding big loads
EV chargers, air conditioning, hot tubs or a basement apartment.
Renovation plans
Kitchen, basement or whole-home projects that need new circuits.
A panel upgrade, step by step
An older panel was replaced with a new breaker panel with room to spare. Every circuit was reconnected, neatly routed and labelled, so future work like an EV charger, a basement suite or a kitchen renovation has the capacity it needs.
Free consultation
We look at your home and talk through what you need.
Clear quote
A written quote listing the equipment and electrical work, before anything starts.
Licensed installation
Careful, clean work with ESA notification handled when required.
Final check
We test everything with you and back the work with a 5-year warranty.
Panel Upgrades: common questions
How do I know if I need a panel upgrade?
Common signs include breakers that trip often, an older or fuse-based panel, and plans to add large loads such as an EV charger, air conditioning or a renovation. We assess your panel during a free consultation.
Do I need a panel upgrade for an EV charger?
Sometimes. It depends on your current panel capacity and the load your home already uses. We check this before recommending anything.
Is the work done by a licensed electrician?
Yes. Our licensed electrical contractor (ECRA/ESA #7006272) completes the work and handles the required ESA notification.
Will my power be off during the upgrade?
Power has to be turned off for part of the work. We explain the timeline in advance so you can plan around it.
Explore more services
Need more electrical capacity?
Tell us about your home and what you have in mind. We'll come back with a clear written estimate.
(416) 520-3195



